FDNY Fire Alarm As-Built Riser Diagram Bulletin

    Home Fire Alarm FDNY Fire Alarm As-Built Riser Diagram Bulletin
    NextPrevious

    FDNY Fire Alarm As-Built Riser Diagram Bulletin

    By Steven Venditti | Fire Alarm | 0 comment | 12 February, 2024 | 0

    Attention to all General Contractors, electricians, fire alarm vendors, engineers and developers. The New York City Fire Department (FDNY) issued a new bulletin related to fire alarm as-built riser diagram requirements. This bulletin supersedes the previous bulletin titled “Technology Management Bulletin No. 3/2010 Submission of Fire Alarm As-Built Drawings”. This new bulletin is titled “Fire Alarm Unit Bulletin # 12-11-2023 As-Built Riser Diagram Requirements” and it went into effect on December 11, 2023.

    WHAT’S THE PROBLEM

    fdny-fire-alarm-as-built-riser-diagram-bulletinIt is common for construction conditions and contractor coordination to result in both additions to, and deletions from, the FDNY approved fire alarm system plans during construction.  At times there were different interpretations of what changes did or did not require a Post-Approval Amendment (PAA) to be filed. This bulletin provides clarifications on these situations and provides more objective criteria that can be used in evaluating whether a PAA is required.

    WHAT ARE THE ALLOWABLE CHANGES

    The FDNY bulletin provides guidance for three different conditions related to fire alarm system as-built riser diagrams as follows:

    • Additions and Deletions – minor additions or deletions, such as adding or deleting up to 10 fire alarm devices or appliances per floor, adding a strobe booster power supply or a fused disconnect switch, etc. are allowed to be made without a Post-Approval Amendment. All of these additions and/or deletions must be shown on the FDNY fire alarm as-built riser diagram. The remainder of the procedures outlined in the FDNY bulletin must be followed as typical for fire alarm system as-built riser diagrams. For deletions, the engineer of record must also submit an affidavit confirming that the devices or appliances shown on the approved plans were not required and therefore not installed.
    • Other Modifications – changing the locations of Data Gathering Panels or downgrade of fire alarm system performance (i.e. Class of circuits) are permitted to be reflected on the FDNY fire alarm as-built riser diagram when accompanied by an affidavit from the engineer of record.
    • For removals and other modifications – the affidavit must list all devices not installed or other deviations from the FDNY-approved fire alarm system plans. The affidavit must also certify that the system design remains fully code-compliant. The certification is permitted to appear on the as-built riser diagram (e.g. it does not need to be a standalone document).

    WHAT IS NOT ALLOWED

    FDNY also provided guidance on system modifications that are not allowed to be reflected on the as-built riser diagram with an affidavit. Any of the following conditions will require a Post-Approval Amendment to be filed with the FDNY. These conditions include:

    • Relocation of fire alarm control panels (Fire Command Centers cannot be installed other than as specified on approved plans without prior approval).
    • Changes that would affect the system type or job description
    • Changes that would affect work floors
    • Changes that would require further review (partial coverage, floor layouts, etc.)
    • Addition and / or exclusion of more than 10 devices / appliances on a floor

    None of the above items discussed in this article apply to Auxiliary Radio Communication Systems (ARCS). Any modifications to FDNY-approved ARCS plans require a Post-Approval Amendment to be filed.

    To find out more or how to apply this to your project contact us.

    No tags.
    Steven Venditti

    Steven Venditti

    More posts by Steven Venditti

    Related Post

    • fire alarm system replacement

      NYC DOB Buildings Bulletin for Fire Alarm Work in Existing Buildings

      By Charles Joyce | 0 comment

      The New York City Department of Buildings (DOB) recently issued Buildings Bulletin 2024-001 (or BB 2024-001) with an effective date of February 9, 2024. This bulletin supersedes the previous Buildings Bulletin 2015-025. The new bulletinRead more

    • FDNY Professional Certification of Fire Alarm System Design and Installation

      By Steven Venditti | 0 comment

      The following three New York City Fire Department (FDNY) Rules have been amended to allow for greater flexibility of the fire alarm plan examination and inspection / approval processes: 3 RCNY §104-02, entitled “Professional CertificationRead more

    • New FDNY Process for Fire Alarm and Temporary Certificate of Occupancy

      By Steven Venditti | 0 comment

      On March 1, 2021 the FDNY issued a new Pilot Program for Remote Video Inspections Performance Test (RVI-PT) to assist buildings in obtaining their Temporary Certificate of Occupancy. In the instance where an FDNY inspection cannot beRead more

    • FDNY Remote Video Inspections

      By Steven Venditti | 0 comment

      Effective December 1, 2020 the FDNY has implemented a program to perform fire alarm inspections remotely called “Remote Video Inspections (RVI)”. The overall intent of the program is to maximize efficiency while minimizing COVID exposures.Read more

    Leave a Comment

    Cancel reply

    Your email address will not be published. Required fields are marked *

    NextPrevious

    Categories

    • Battery Energy Storage Systems
    • Fire Alarm
    • Smoke Control Systems
    • Sprinklers

    Recent Posts

    • Annual Testing Requirements for Smoke Control Systems: Ensuring Safety and Compliance
    • Battery Energy Storage Water Spray Systems in NYC
    • BESS Certificate of Approval and Site-Specific Approval – New York City
    • NYC DOB Buildings Bulletin for Fire Alarm Work in Existing Buildings
    • FDNY Fire Alarm As-Built Riser Diagram Bulletin

    Archives

    • October 2024
    • July 2024
    • April 2024
    • March 2024
    • February 2024
    • July 2023
    • May 2021
    • March 2021
    • December 2020
    • February 2017

    Sparc Fire Protection Engineering, LLC.

    New York, NY
    212.392.5868
    ny@sparcfp.com
    Connecticut
    203.391.6633
    ct@sparcfp.com
    © 2024 Sparc Fire Protection Engineering, LLC. | All Rights Reserved
    • home
    • services
      • Building and Fire Code Consulting
      • Fire Alarm Consulting
      • Expediting and Authority Liaison
      • Performance-Based Design
      • Emergency Planning and Preparedness
      • Fire Protection Systems Design, Review and Oversight
    • projects
    • sparc notes
    • join us
    • about
      • our team
      • why sparc
    • contact
    Sparc